Tweed Recycling and Landfill Centre Master Plan

Share Tweed Recycling and Landfill Centre Master Plan on Facebook Share Tweed Recycling and Landfill Centre Master Plan on Twitter Share Tweed Recycling and Landfill Centre Master Plan on Linkedin Email Tweed Recycling and Landfill Centre Master Plan link

The Master Plan will transform the current Stotts Creek Resource Recovery Centre into a more user friendly and innovative site. It sets the stage to achieve less waste to landfill and is part of our Towards Zero Waste goal. It will maximise the use of materials already available and only place waste in landfill as a last resort.

Actions to improve the site for residents include:

  • placing less in landfill
  • moving around the site safely
  • knowing what to drop off and where
  • reducing, recycling and reusing as much as possible

Stotts Creek Resource Recovery Centre will remain open during all construction. We ask residents to take care and be aware – of workers, signs and speeds.

Let’s keep everyone safe.

Master Plan actions and phases

Phase 1: Improve the layout and site design for all users.

Phase 2: Preparing for future landfill

Council is working towards our Towards Zero Waste goal, which means saving 90% of waste from landfill. Securing land space for the community’s future landfill waste is also a longer term goal.

Planning for our future waste is very important as:

  • some products can’t be recycled or reused
  • some problem waste still needs to go to landfill
  • with current waste behaviours in the community, the landfill currently being built will be full in about 5 to 7 years with current waste behaviours.

We need to plan in advance, even when the aim is to place less waste into landfill, preparation is needed. Land space is limited, approvals are rigorous and time sensitive.

This is the last stage of the Master Plan.

The Master Plan will transform the current Stotts Creek Resource Recovery Centre into a more user friendly and innovative site. It sets the stage to achieve less waste to landfill and is part of our Towards Zero Waste goal. It will maximise the use of materials already available and only place waste in landfill as a last resort.

Actions to improve the site for residents include:

  • placing less in landfill
  • moving around the site safely
  • knowing what to drop off and where
  • reducing, recycling and reusing as much as possible

Stotts Creek Resource Recovery Centre will remain open during all construction. We ask residents to take care and be aware – of workers, signs and speeds.

Let’s keep everyone safe.

Master Plan actions and phases

Phase 1: Improve the layout and site design for all users.

Phase 2: Preparing for future landfill

Council is working towards our Towards Zero Waste goal, which means saving 90% of waste from landfill. Securing land space for the community’s future landfill waste is also a longer term goal.

Planning for our future waste is very important as:

  • some products can’t be recycled or reused
  • some problem waste still needs to go to landfill
  • with current waste behaviours in the community, the landfill currently being built will be full in about 5 to 7 years with current waste behaviours.

We need to plan in advance, even when the aim is to place less waste into landfill, preparation is needed. Land space is limited, approvals are rigorous and time sensitive.

This is the last stage of the Master Plan.

Tweed Recycling and Landfill Centre Master Plan

Council has commenced a major transformation of the existing Stotts Creek Resource Recovery  Centre to meet the needs of the shire well into the future. The Master Plan covers key phases of the project and Council would like to hear your thoughts on the work being undertaken.

You need to be signed in to comment in this Guest Book. Click here to Sign In or Register to get involved

Why can’t council give each ratepayer Two free box trailer loads or
4 car boot load vouchers when they pay their rates. Annually.
Apparently it cost TSC over $85,000 in illegal dumping clean ups last year.
This would certainly cut that figure down on this disgusting habit of some.

johnfrancis over 3 years ago

I believe that the road direct from Murwillumbah needs to be fully sealed, not partly.

Bruce Corston over 3 years ago

Better sorting is required and new technology. For example Launceston has a conveyor belt system and styrofoam recycling, it would be a great project to look at. We need more ambitious waste management goals then just space to bury waste.

Kit over 3 years ago

Removed by moderator.

crabbes creek community hall over 3 years ago

Why cant tweed shire have a bulk recycling depot like lismore

crabbes creek community hall over 3 years ago
Page last updated: 25 Nov 2024, 11:30 AM