CLOSED: This survey has concluded.
Timing of stage 2 works along Leisure Drive
Feedback closed on Sunday 4 February 2024.
Stage 2, located at sites 3 and 4 along Leisure Drive, will include the installation of a signalised pedestrian crossing, kerb and gutter works, stormwater drainage modifications and pavement widening.
Due to the high traffic volume, the preference is to carry out the works during school holidays to minimise traffic disruptions.